Follow the evidence.
Explore the decision.
Try three illustrative workflows inside Simba. These examples are synthetic and do not run a model or change a budget.
Less guesswork.
More ways to explore.
Try three connected workflows. Inspect an estimate, compare model-informed plans, or sketch your next test.
There’s more to a result
than one number.
“How much did each channel contribute, and how certain are we?”Compare estimates with their ranges. Keep the assumptions close to the decision.
Explore shared studies ↗See values and assumptions
| Channel | Estimate | 90% interval |
|---|---|---|
| Paid Search | 32 | 24 to 40 |
| Paid Social | 24 | 12 to 36 |
| Video | 16 | 6 to 26 |
Invented values illustrate an evidence review. Contribution is not return on spend or proof of causality. Real results require model diagnostics and business review.
A plan shaped by
your model.
“How should we allocate next month’s budget across channels, given our objective and constraints?”Start with a completed model. Set the budget, planning period, channel limits and uncertainty preference. Compare the resulting plan before acting.
Inspect constraints, uncertainty and values
| Channel | Limits* | Plan |
|---|---|---|
| Paid Search | 20% to 60% | $50,000 |
| Paid Social | 20% to 50% | $30,000 |
| Video | 10% to 30% | $20,000 |
*Percentages of the $100,000 budget. Example assumes weekly model periods, even timing, declared channel costs and historical carryover included. All three example plans satisfy these bounds.
Uncertainty enters the optimization objective through a penalty on outcome spread. Review posterior marginal-return intervals at the optimized spend separately from the solver’s objective marginal. Those are different quantities.
Modeled revenue uses the optimizer’s removal-lift decision basis. A historical outcome comparison must use the separate fitted-convention comparison fields.
Pre-authored synthetic results. Selecting a plan switches example inputs and outputs together. It does not run an optimizer, recalculate a forecast or change an advertising budget. Real results come from a completed run on your model.
Make the next test
easier to discuss.
“How would the test fit into our calendar?”Change the run window to explore a simple timeline. A calendar comes before a real design calculation.
Explore incrementality ↗What a real design still needs
Model evidence, a defined outcome, treatment and holdout units, detectable effect, statistical assumptions and permissions. A longer window does not guarantee power or a feasible test. This control does not run a calculation or launch an experiment.
Interactive concept with synthetic data. Real analysis runs in Simba or a compatible assistant. Your team reviews the decision.
LOCAL DEMO / NO ACCOUNT NEEDED